![]() |
![]() CONTROLLED
ENVIRONMENT The primary environmental features include: Primary cooling infrastructure, centrally managed and linked to Build Management System Room Air Conditioning Units (RACUs) Regulated humidity within a constant range Chilled water HVAC system with no environmentally hazardous refrigerants minimum N+1 stand-by on all cooling systems 24x7 on-site engineers heat-flow dynamics models by specialist contractors Planned Preventative Maintenance, reporting year round Critical Service Level Agreements on cooling
provision |
|||||
|
||||||